Fremont, Belmont, & Madison Drainage Improvements

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7

Project Facts

Plan No:
2019PW0035
Estimated Construction Start:
Spring 2021
Budget:
$825,000
Funding Source:
¼-cent Capital Improvement Sales Tax & Level Property Tax
Design Engineer:
Crawford, Murphy, & Tilly Inc.
Design Features:
This project consists of installation of approximately 2200 linear feet of reinforced concrete storm pipe, and will include curb and gutter, sidewalk, driveway, pavement replacement, and installation of erosion control and traffic control measures. City Utilities Gas and Water relocations will also be required for this project.
General Location:
This project consists of installation of an underground storm system beginning at the intersection of Belmont St. and Rogers Ave., continuing along Belmont St. to Fremont Ave., from Fremont Ave. to Madison St., and ending at the intersection of Madison St. and Weller Ave.
Objectives:
This area was identified as an area of major flooding. The project objective is to reduce flooding to the properties that have made requests.