The Fairgrounds Green Infrastructure Project will provide water quality treatment to an area that collects stormwater drainage from the western portion of the fairgrounds property as well as off-site residential area currently without water quality treatment. The project will have a combination of a variety of green infrastructure and water quality infrastructure to treat the stormwater.
Current Status: Finalizing Concept Plans
Estimated date of construction: Fall 2023
Funding:
- Total Estimated Project Cost: $900,000
- ARPA Funding Received: $700,000
- Cost Share: $200,000 from Clean Water Enterprise Funds – this amount maximized the local share scoring category by matching >20%