The Fairgrounds Green Infrastructure Project will provide water quality treatment to an area that collects stormwater drainage from the western portion of the Ozark Empire Fairgrounds property as well as off-site residential area currently without water quality treatment. The project will include several rain garden features with native plantings, pervious pavers, and a hydrodynamic separator.

  1. 1
  2. 2


Site Plan Concept

Fairgrounds Concept Site plan with images


Contact

Project Manager: Saki Urushidani [email protected]

Project Facts:

Construction Begin: 
January 2024

Estimated Completion: 
Summer 2024

Contractor: 
Branco

Design Consultant: 
Olsson

Cost: $1.4 million