Fairgrounds Green Infrastructure

Fairgrounds Concept Site plan with images

Site Plan Concept

12-13-22 Fairgrounds Before

Fairgrounds Before

The Fairgrounds Green Infrastructure Project will provide water quality treatment to an area that collects stormwater drainage from the western portion of the fairgrounds property as well as off-site residential area currently without water quality treatment. The project will have a combination of a variety of green infrastructure and water quality infrastructure to treat the stormwater.


Current Status: Finalizing Concept Plans

Estimated date of construction: Fall 2023

Funding: 

  1. Total Estimated Project Cost: $900,000
  2. ARPA Funding Received: $700,000
  3. Cost Share: $200,000 from Clean Water Enterprise Funds – this amount maximized the local share scoring category by matching >20%