The Pickwick & Grand Stormwater Improvement Project will replace a failing stormwater box culvert with approximately 700 feet of new box culvert and pipe as well as the installation of seven new curb inlets, one junction box, restoration of disturbed surfaces and features and the filling of the decommissioned box culvert. 

The project is a product of ongoing stormwater infrastructure inspections performed by the City's stormwater Division which located the failing structure prior to collapse. Due to the unorthodox location of the 100+ year old culvert below and adjacent to occupied residences, the design and bidding process were prioritized and expeditiously completed in the interest of public safety. 

Project Area Map

Pickwick Grand Stm Imp - Area Map

Project Facts:

Construction Begin: 
January 2024

Estimated Completion: Spring 2024

Contractor: TBD

Design Consultant: 
CJW Transportation Consultants

 Cost: $903,000

Funding Source: 1/8-cent Transportation Sales Tax, Surface Transportation Block Grant (STBG) funds, MoDOT cost share